Quantity and Rate Analysis for Reinforced Concrete ...

Today we will see how to prepare rate analysis for Reinforced Concrete (RCC) work. First step to rate analysis is the estimation of labour, materials, equipments and miscellaneous items for particular quantity of reinforced concrete. The second step is to determine the component of structure for ...

Analysis & Rates, Analysis and rates for construction work ...

Analysis & Rates. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. ... Cement concrete work per 2.83 cum (100cuft) laying cement concrete – 2 beldars, 3 mazdoors, ¾ bhisti and ¼ mason, can do 2.83 cum (100 cuft) per …

How to Calculate Cement, Sand and Aggregate required for 1 ...

The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry …

Concrete Mix Design | Different Grades of Concrete

May 17, 2017· Concrete Mix Design:-Concrete is a composite mixture which consists of Cement, Sand and Aggregate. Concrete mix design is the procedure for finding the right quantities of these materials to achieve the desired strength. Accurate concrete mix design makes concrete …

how we calculate of Sand, cement and aggregate of M20 ...

how we calculate of Sand, cement and aggregate of M20 ratio or other ratio? ... Once the W/C ratio is determined use 186 kg water (for 20mm CA) to find out the qty. of cement per cum of concrete ...

For one meter cube of concrete how much kg steel is ...

For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus =0.001, for bending with axial force mus =0.0025, b ...

COST OF 1 CU.M OF M20 GRADE CONCRETE | Facebook

Aug 30, 2014· So if we take 'A' cum of cement, we must take '1.5A' cum of sand and '3A' cum of course aggregate. So the total volume = A + 1.5A + 3A = 5.5A To make 10 cum of concrete, we must take a total volume of 15.2 cum of cement, sand and aggregate put

Concrete Mix Design – M 20 Grade Of Concrete

A mix of M-80 Grade suitable for pumped concrete is to be designed with the following materials and detail. 1. OPC 53 Grade, 7-day strength 52.5 N/mm2, Spgr 3.15

How many cement in use gp2 grouting cement in 1 cubic meter

A 94# bag of portland (approximately 1 cubic foot) would yield 6 cubic feet of concrete. 3 cubic yards of concrete x 27 (cubic feet per yard) = 81 cubic feet; 81 / 6 (cubic feet of concrete per b ...

Ready Mixed Concrete - Ready Mix Concrete Latest Price ...

Find here Ready Mixed Concrete, Ready Mix Concrete manufacturers, suppliers & exporters in India. Get contact details & address of companies manufacturing and supplying Ready Mixed Concrete, Ready Mix Concrete, Readymix Concrete across India.

2019 Concrete Delivery Costs - HomeAdvisor

According to the NRMCA, the cost of concrete is $108 per cubic yard. Pouring concrete ranges in price from $8 to $18 per square foot, depending on the quality and patterns of the stamped concrete. One of the primary benefits of concrete, aside from its durability and stability, is its versatility.

Quantities of Materials Per Cubic Meter of Concrete Mix ...

Home / How To Guide / Quantities of Materials Per Cubic Meter of Concrete and Mortar Mix Proportions Quantity of materials such as cement, sand, coarse aggregates and water required per cubic meter of concrete and mortar for different mix proportions varies with the mix design of the concrete …

rcc rate per cubic meter - Exterior Ideas | Construction Tips

The rates of RCC is depend on the quantity of MS steel bars used in the concrete and rcc used on what situation i.e. in footing, beam, roof. In general the rate is 7000-00 per cum including material, shuttering and labor BUT excluding the cost of MS steel bars.

DR. FIXIT MICRO CONCRETE - Constrocare

• Saturate the substrate with water to prevent absorption of water from the mixed material of Dr. Fixit Micro Concrete • For a dry substrate, it should be primed by applying one coat of Dr. Fixit Epoxy Bonding Agent. • Mix Dr. Fixit Micro Concrete with water (3.75 to 4 litres per 25 kg bag) till homogeneous mix is obtained, at 30 oC

Calculate cement sand and aggregate | Nominal Mix Concrete ...

Following is a simple method used by engineers to calculate cement, sand and aggregate to produce different grade of concrete like M5, M7.5, M10, M15 and M20. if you don't want to learn the math involved in the design, you can use the table given at the end of the article to produce different grade of concrete.

Batching Plants - 60 Cum Per Hour RMC Plant Set Up Service ...

Service Provider of Batching Plants - 60 Cum Per Hour RMC Plant Set Up, RMC Plant Set Up on lease, Concrete Batching Plant and Stationary Concrete Batching Plants offered by O & M Services Company, Navi Mumbai, Maharashtra.

Ready Mixed Concrete in Mumbai, रेडी मिक्स्ड कंक्रीट ...

Business listings of Ready Mixed Concrete, Ready Mix Concrete manufacturers, suppliers and exporters in Mumbai, रेडी मिक्स्ड कंक्रीट विक्रेता, मुंबई, Maharashtra along with their contact details & address. Find here Ready Mixed Concrete, Ready Mix Concrete suppliers, manufacturers, wholesalers, traders with Ready Mixed Concrete ...

How many bags of cement in m30 grade concrete for 1 cum?

There is no fixed rule for this. If manual mix, cement content shall vary between 350 ~ 400 Kg / M3. Where as for Design mix (RMC), the cement content is decided by the suppl … ier based on lot ...

Concrete, Cement & Masonry – The Home Depot

Whether you're looking to set a new walkway, repair an existing structure or take on a DIY project, The Home Depot has all of the concrete, asphalt repair and masonry tools you need to get the job done right. The Right Stuff When you're taking on a concrete project, make sure you've got the right type of bagged concrete mix to handle the job.

SCHEDULE "A" BILL OF QUANTITIES Part - I : Construction of ...

hand broken trap metal 9 cum per 100 m2 and 20 mm trap metal at the rate of 1.5 cum/100 sqm., heating and spreading bitumen (excluding tack coat) at 250 kg./100 m2, spreading 12 mm size key aggregate at the rate of 1.8 cum/100 sqm and compaction with vibratory roller complete. Grade of bitumen shall be 60/70. On WBM/WMM surface

how to calculate rate analysis of M25 grade concrete

how to calculate rate analysis of M25 grade concrete. ALLInterview.com. Categories ... how to calculate rate analysis of M25 grade concrete.. Answer / khaan. If it is design mix the cement consumption will depend upon ... rate. finally we get Rate per Cum. Is This Answer Correct ? 19 Yes : 8 No :

User account | Ocean Concrete

Concrete Facts; Concrete Calculators. Concrete Volume Calculator; Evaporation Calculator; Concrete Finishes; Concrete Sealers; Curing; Concrete Maintenance; Concrete In Practice (CIPs) Truck Specifications; SDS/MSDS; Industry Resources; Projects; Responsibility. Responsibility Mixed In; In Health & Safety. Zero Harm Target; The Cardinal Safety ...

How to Estimate Concrete Costs - thebalancesmb.com

Estimating the cost of new concrete involves much more than the price of concrete per yard (or meter).There are many variables to consider, such as surface prep, formwork, reinforcing materials, and finish work, plus the cost of the ready-mix concrete, that will add up to the total price of the job.

How to Calculate Cement, Sand and Aggregate Quantity in ...

Oct 16, 2016· How to Calculate Cement, Sand and Aggregate Quantity in Concrete About : This channel contains Technical Lectures on "Civil Engineering" from personal field experience. SUBSCRIBE channel and HIT ...

How to Calculate Quantities of Cement, Sand and Aggregate ...

In the step 3 of "How To Calculate Quantities Of Cement, Sand And Aggregate For Nominal Concrete Mix (1:2:4)" you have calculated that: 01 cum of concrete will require Cement required = 1/0.167 = 5.98 Bags ~ 6 Bags Sand required = 115/0.167 = 688 Kgs or 14.98 cft …

Civil Work - CONCRETE GRADE: M5 = 1:4:8 M10= 1:3:6 M15 ...

May 13, 2015· See more of Civil Work on Facebook. Log In. or. Create New Account. See more of Civil Work on Facebook. Log In. ... 11. 1 Cum 1000.00 Litre UNIT WEIGHT: 01. Concrete 25 kN/m3 02. Brick 19 kN/m3 03. Steel 7850 Kg/m3 04. Water 1000 Lt/m3 05. Cement 1440 Kg/m3 ... No. on bricks per 1cu.m= 1/volume of1st class brick with motor =1/0.002 = 500 no's ...

SCHEDULE OF RATES - Bharat Heavy Electricals Ltd.

BHEL Schedule of Rates BHEL ITEM NO DESCRIPTION UNIT Contractors Rate( Rs) Remarks SCHEDULE OF RATES 10.3 Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 Ltr per linear mtr including drillinng and plugging holes etc. 10.3.1 with chlorpyriphos/ lindane E.C 20% with 1% concentration sqm 10.45 10.4 Nil

What is the cost of concrete per m3 in india? - Quora

What is the cost of concrete per m3 in india? Update Cancel. ... Rate Analysis of Concrete. The following things should be considered while Rate analysing. ... The approx manpower requirement has listed below for 1 Cum of concrete in terms of days. Mason – 0.3 Days. Male Coolie – 1 Day.